AdministrativeControlBuildings NN1

Project Details

Client: BP
Consultant: BECHTEL
Main contractor: PETROJET
Location: IDKU, Burullus,  - Egypt
Sector: Infrastructure
Status:Handed Over

Project Overview

EGEMECH executed the Engineering, Procurement and Construction (EPC) of the complete HVAC system for the West Nile Delta Upgrade Project at Idku, Burullus. The project included six key facilities, ensuring safe, efficient, and explosion-proof climate control in highly demanding environments.

Scope of Work

EPC of HVAC systems for 6 buildings:

Control Building
3 Substation Buildings
3 Gate Houses
Installation of 3 Chillers with AHUs for the Main Control Building.
Supply and installation of 9 Condensing Units (DB Brand, 60 TR each) with matching AHUs (15,000 CFM each).
Battery Room Ventilation System.
Blast Dampers (Wazair – UK).
Explosion-proof smoke fans.
Full HVAC Control System.
MCC (Motor Control Center) for the HVAC system.

Discover the Scale of Our Solutions.