CBD (Central Business District) in New Capital

Project Details

Client: Ministry of Housing
Consultant: DAR
Main contractor: CESEC
Location: New Capital - Egypt
Sector: Infrastructure
Status: Under Construction

Project Overview

EGEMECH was contracted for the Engineering, Procurement and Construction (EPC) of HVAC systems for the Central Business District in Egypt’s New Administrative Capital. The scope covered both control and substation buildings, as well as the installation of an extensive chilled water pre-insulated pipe network.

Scope of Work

EPC of HVAC systems for the Control Building and Substation Buildings.
Installation of Phase I infrastructure chilled water network (approx. 8 km).
Pre-insulated piping supplied by PermaPipe, including:

Welding procedure with radiographic (RT) testing.
Leak detection system.
Field joint kits.
Hydrostatic testing.
Pipe sizes up to 56” and 36” mains.
Execution of valve chambers and building connections.

Discover the Scale of Our Solutions.