Project Overview

EGEMECH executed multiple electromechanical packages at New Giza University, covering Cooling Systems, Fuel Systems, and Advanced Smoke & Ventilation Engineering.

The works included high-capacity cooling tower installation, fuel system integration, and CFD-based smoke management design for atrium areas—ensuring operational efficiency, fire safety compliance, and optimized environmental control across the campus facilities.

Scope of Work

- Engineering:

Underground pipe stress analysis (thermal expansion, soil loads, anchor reactions).
Optimization of supports and expansion control.
Technical calculation reports and consultant approvals.
- Supply:

Factory-fabricated pre-insulated steel pipes (PUR insulation + HDPE jacket).
Fittings, anchors, and required accessories.
- Installation:

Welding as per approved WPS procedures.
Field joint insulation and sealing.
Hydrostatic pressure testing.
System handover and documentation.

- Cooling & Water Treatment Systems

Supply & Installation of 2 × Cooling Towers (2,500 TR each).
Supply of Sand Filters for water treatment and system protection.
- Smoke Management & Ventilation Engineering

CFD Analysis for Atrium Smoke Scenarios.
Design validation based on smoke propagation modeling.
Supply & Installation of Smoke Ventilation System.
Supply & Installation of Complete Ventilation Systems.