Kattamiya Life Style Marakez -D5-DCP - District Cooling Plant

Project Details

Client: Tabreed - Gas Cool
Consultant: ECG - ALLIED
Main contractor: Gas Cool
Location: Sukhna Road - New cairo
Sector:Commercial & Urban Development
Status: On Going

Project Overview

EGEMECH executed the Engineering, Procurement, and Construction (EPC) works for the Main District Cooling Plant (DC5) at Kattameya Lifestyle – Marakez, New Cairo.

The project comprised the full HVAC, Fire Fighting, and Electrical systems for a 7,500 TR district cooling plant, delivering a high-capacity, energy-efficient cooling solution designed to support large-scale mixed-use development with maximum operational reliability and safety.

Scope of Work

Cooling Plant Capacity: 7,500 TR:

HVAC Systems:

-5 × Chillers (1,500 TR each – Medium Voltage).
5 × Cooling Towers.
Primary & Secondary Chilled Water Pumps.
Condenser Water Pumps.
Electrical Systems:

MCC (Motor Control Center).
MDB (Main Distribution Board).
Transformers.
Light Current & Data Systems.
Fire Fighting & Safety Systems

Fire Alarm System:
FM200 Clean Agent System.
Aerosol & CO₂ Suppression Systems.
Automatic Sprinkler System.
Security Systems

CCTV Surveillance System.