Client: BP
Consultant: BECHTEL
Main contractor: PETROJET
Location: IDKU, Burullus, - Egypt
Sector: Ventelation and HVAC
Status:Handed Over


EGEMECH executed the Engineering, Procurement, and Construction (EPC) of the HVAC system for six critical buildings within the West Nile Delta Project – Idku, Egypt.
The scope covered the complete design, supply, installation, and commissioning of high-performance HVAC systems serving the Control Building, Substation Buildings, and Gate Houses. The systems were engineered to meet the stringent operational, safety, and explosion-proof requirements of the Oil & Gas sector.


EPC for 6 Buildings
-Control Building
-Three Substation Buildings
-Three Gate Houses
Cooling & Air Distribution Systems
-3 Chillers serving the Main Control Building.
-9 Condensing Units (60 TR each – DB Brand) with matching AHUs -(15,000 CFM each).
-Complete air handling and distribution network.
Specialized Systems
-Battery Room Ventilation System.
-Explosion-proof smoke fans.
-Blast Dampers (Wozair – UK).
Electrical & Controls
-Integrated HVAC Control System.
-MCC (Motor Control Center) for full HVAC operation.