Client: Assiut Oil Refining Company (ASORC)
Consultant: ENPPI
Main contractor: ENPPI
Location: Assiut, Egypt
Sector: Infrastructure
Status:Handed Over


EGEMECH executed the Engineering, Procurement, and Construction (EPC) of the HVAC system for the Naphtha Complex at Assiut Oil Refining Company (ASORC).
The scope covered complete HVAC solutions for the Control Building and Substation Buildings, designed to meet the stringent environmental, operational, and explosion-proof requirements of a live oil refining facility.


EPC for 2 Critical Buildings
Control Building
Substation Buildings
HVAC Systems
6 × Air Handling Units (AHUs) with associated Condensing Units.
Complete air distribution network.
Specialized & Safety Systems
Battery Room Ventilation System.
Fire & Gas Dampers (Wozair – UK).
Explosion-proof Smoke Fans.
Electrical & Controls
Integrated HVAC Control System.
MCC (Motor Control Center) for HVAC operations.